Literature DB >> 16125310

How powerful is ARAMIS methodology in solving land-use issues associated with industry based environmental and health risks?

Davor Kontić1, Branko Kontić, Marko Gerbec.   

Abstract

The first experience on how a part of the ARAMIS methodology has contributed to demonstration of safety in the licensing process in Slovenia for a new Seveso II plant is described. There are two foci of this description: first, trustworthy of the methodology for evaluating safety, and second, the role of a land-use plan in issuing a construction permit for the new plant. In the context of the first focus, we present why has been safety report first rejected by the regulator, and later-on accepted after applying components of the ARAMIS methodology in its revised version. In the context of the second focus, we discuss a relationship between the land-use plan and the licensing process for the new plant. The outcomes of this Seveso II plant licensing case are that the ARAMIS approach, in spite it was still under development when applied, is more transparent and credible comparing to the others, which have also been applied. This is related to the demonstration of how safety management system and general safety behaviour is integrated into the overall management policy. The conclusions take into account regulator's response in the licensing process.

Mesh:

Substances:

Year:  2005        PMID: 16125310     DOI: 10.1016/j.jhazmat.2005.07.012

Source DB:  PubMed          Journal:  J Hazard Mater        ISSN: 0304-3894            Impact factor:   10.588


  1 in total

1.  Analysis of spatial planning documents and strategic environmental assessment reports with regard to hazards of major industrial accidents: a case study involving six Polish cities.

Authors:  Maria Teresa Markiewicz
Journal:  Environ Sci Pollut Res Int       Date:  2020-03-16       Impact factor: 4.223

  1 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.