Literature DB >> 15691201

Feasibility studies and pre-design simulation of Warsaw's new wastewater treatment plant.

J A Oleszkiewicz1, E Kalinowska, P Dold, J L Barnard, M Bieniowski, Z Ferenc, R Jones, A Rypina, J Sudol.   

Abstract

The proposed transfer of wastewater from the western part of Warsaw, across the Wisla (Vistula) River for joint treatment at the existing eastern side "Czajka" wastewater treatment plant (WWTP) will result in combined winter flows of approx. 580,000 m3 d(-1). One-year of pilot-scale studies defined the COD characteristics and kinetics of nitrogen removal and VFA production from primary sludge. BioWin simulation was used to size and price the optional processes and pointed to the Westbank process as the most cost-effective. The process consists of a sequence of a RAS pre-denitrification zone followed by an anaerobic, anoxic and aerobic zone. Some 100-150 t d(-1) of 10% methanol would be needed to remove 2-4 mg l(-1) of NO3-N above the recommended effluent level TN = 10 mg l(-1). Applying the principle of annual average 80% TN removal, and allowing for use of daily composite samples (rather than grab) could annually save the municipality over 1.5 million Euro on external carbon source.

Entities:  

Mesh:

Substances:

Year:  2004        PMID: 15691201     DOI: 10.1080/09593332508618472

Source DB:  PubMed          Journal:  Environ Technol        ISSN: 0959-3330            Impact factor:   3.247


  1 in total

1.  The Effects of Wastewater Treatment Plant Failure on the Gulf of Gdansk (Southern Baltic Sea).

Authors:  Marta Jaskulak; Maksymilian Sotomski; Małgorzata Michalska; Roman Marks; Katarzyna Zorena
Journal:  Int J Environ Res Public Health       Date:  2022-02-11       Impact factor: 3.390

  1 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.