| Literature DB >> 15676345 |
P Knauth1, W Rohmert, J Rutenfranz.
Abstract
Taking into account the numerous theoretically possible shift systems, we chose sensible shift systems with the aid of objective work-physiological criteria, eg, the duration of the daily working time, the positioning and duration of sleep and recreation time. With an agreed 40 h week shift, systems with a weekly working time of 42 h are more advantageous. If the shifts are equally attended over 24 h the following shift systems are recommended: when you have 8 h shifts the relation between the number of working days and the number of free days should be "3 n/n", whereby n must be larger than 1, within one shift rota. In the exceptional case of a 12 h shift the corresponding relation should be "2 n/n". Further unsuitable and recommended shift plan examples are demonstrated for these shift systems.Year: 1979 PMID: 15676345 DOI: 10.1016/0003-6870(79)90003-6
Source DB: PubMed Journal: Appl Ergon ISSN: 0003-6870 Impact factor: 3.661