| Literature DB >> 12381014 |
V Eroğlu1, H Z Sarikaya, E Yüksel, I Koyuncu.
Abstract
Küçükçekmece Lake is a sea lagoon located on the European side of Istanbul city with a drainage area of 4 million inhabitants (year 2040). The original plan to treat all of the wastewater collected from the drainage basin in a single plant located at the Northern end of the lake is compared with the decentralised option involving 4 treatment plants. The initial investment cost of the decentralised option is estimated to be higher than the original plan by an amount of 43 million US $. However, the decentralised option has been chosen finally, considering the low cost and risk of wastewater collection, the possibility of the staging of the services, and the reduced environmental impacts.Mesh:
Year: 2002 PMID: 12381014
Source DB: PubMed Journal: Water Sci Technol ISSN: 0273-1223 Impact factor: 1.915