Literature DB >> 10394394

Quality assurance at the heavy-ion therapy facility at GSI.

P Heeg1, G Hartmann, O Jäkel, C Karger, G Kraft.   

Abstract

In the present stage between the technological realization and the clinical phase, quality management gains a predominant role at the heavy ion therapy facility at GSI. Specific quality inspection procedures had to be developed for the subsequent parts of the beam delivery system, the treatment planning, the raster scanning device, the patient positioning, the dose verification and the safety interlock system. In the meantime the acceptance test of the whole facility has been carried out and an overview about our first experience with quality assurance procedures at the heavy ion irradiation facility is given, with a special emphasis on the medical physics part.

Entities:  

Mesh:

Year:  1999        PMID: 10394394     DOI: 10.1007/bf03038885

Source DB:  PubMed          Journal:  Strahlenther Onkol        ISSN: 0179-7158            Impact factor:   3.621


  1 in total

1.  Treatment planning for the heavy-ion facility at GSI.

Authors:  O Jäkel; M Krämer; G H Hartmann; P Heeg; C P Karger; G Kraft
Journal:  Strahlenther Onkol       Date:  1999-06       Impact factor: 3.621

  1 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.