Literature DB >> 10129039

Hospital saves with bedside point-of-care system.

D A Weiss1, S Hailstone.   

Abstract

Do bedside and point-of-care systems actually deliver on their promise of reducing operating expenses while helping improve the overall quality of healthcare? And how does a healthcare facility quantify associated "productivity" improvements to prove cost savings? These are two critical issues that healthcare providers face in implementing a bedside or point-of-care (POC) system. Barnes Hospital, St. Louis, is a 1,000 bed member facility of the Barnes-Jewish Inc./Christian Health Services integrated health system. Barnes Hospital has indeed seen significant cost savings as a result of a POC project.

Mesh:

Year:  1993        PMID: 10129039

Source DB:  PubMed          Journal:  Comput Healthc        ISSN: 0745-1075


  2 in total

1.  Use of the equity implementation model to review clinical system implementation efforts: a case report.

Authors:  T W Lauer; K Joshi; T Browdy
Journal:  J Am Med Inform Assoc       Date:  2000 Jan-Feb       Impact factor: 4.497

2.  Patient data management systems in intensive care--the situation in Europe.

Authors:  P G Metnitz; K Lenz
Journal:  Intensive Care Med       Date:  1995-09       Impact factor: 17.440

  2 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.